- Design for PED and ASME VIII-1 certification of a new sterilizer for sanitary use.
- Design assessment for PED complianceof a 6000 L reactor for a chemical plant, designed in accordance with the ASME VIII-1 Code.
- Design in accordance with VSR (Rule VSR.8.B.2) of an epoxy resin isolator to be used for GIS devices and issue of the technical report to get INAIL authorization for use.
- PED compliance consulting activity on the design of a 900 Boiler Economizer Block.
- PED compliance consulting activity on the design of piping lines for the Iplom Plant in Busalla.
- Design in accordance with ASME B31.1, using the finite element analysis, of a special WYE-Piece for a power plant in Turkey (More).
- Design in accordance with ASME B31.8 of a “Pig Launcher” and a “Pig Receiver” for the SIBA Field development Project (Iraq).
- PED compliance consulting activity on the design of piping lines of CHHP plant, Sasol factory in Augusta.
- Consulting activity on ASME Boiler and Pressure Vessel Code for Inspection activities.
- Design for PED certification of an evaporator submerged cylinder with two chambers aimed to ice production.
- Structural analysis using a finite element model to design a piping anchor flange in accordance with ASME VIII-2 Code.
-
Dynamic analysis, performed with Ansys, of a melter reactor, including the internal piping system, subject to the mixer periodic loads (More).
-
Consulting activity on PED and ATEX classification of a regulating panel for the iron and steel industry.
-
Design in accordance with the ASME Boiler and Pressure Vessel Code Section VIII Division 1 of a small sterilizer for sanitary use, including fatigue assessment with finite element analysis (More).
-
Designed in accordance with EN 13445 and prepared the PED technical file for Plate Heat Exchangers (PHE).
-
Consulting activity on European Directives and certification new market outlooks.
-
PED compliance consulting activity on the design of piping lines of Augusta and Ragusa Plants.
-
PED compliance consulting activity on the design of Air Fin Heat Exchangers for the Augusta Plant.
-
Construction design in accordance with the European Norm EN 13445 of Active Carbon Filters made in titanium for the Mariner Topside EPC Offshore Plant.
-
Construction design in accordance with the European Norm EN 13445 of three Dosing Tanks made in titanium for the Mariner Topside EPC Offshore Plant.
-
PED compliance consulting activity on the design of piping lines for the Sarpom Plant revamping.
-
Construction design, including finite element analysis, of special components of piping lines working in creep regime.
-
PED compliance consulting activity on the design of several refrigerating plants for use in public main stores.
Main international projects
In charge of the Cernavoda (Romania) Unit 2 Nuclear Power Plant turbine-generator (700 MW) project management including supply, construction, installation and commissioning…
Main national projects
Achieved from the Genoa Municipality the task to develop the structural inspection of the public works related to the canalization of the Negrone and Senza Nome canals, and the independent check of the design of the digesters of the waste treatment plant…
Consulting on code compliance
Assessed compliance to PED, ASME BPVC and other standards for hundreds pressure equipment, poer and process piping, safety valves, expansion joints…
Structural engineering
Performed the structural design according to the AISC standard of the WaoGaoQiao (China) power plant 900 MW coal boiler supporting structures…
Pressure equipment engineering
Performed construction design of dozen pressure vessels, heat exchangers, towers, chimneys, columns, in accordance with the main international and national standards…
Industrial piping engineering
Carried out construction design (flexibility analysis and plant arrangement drawings) of the piping systems of dozen power and process plants, in Italy and abroad…
Civil constructions and plants
Execution design of the new Medicean wharf of Livorno Port and we followed up the construction of the domes and telescopes EAS-TOP at Campo Imperatore...
Safety analyses
Developed classification of dangerous areas for the RAF A1 – New Water Plant Ras Abu Fontas – Qatar in accordance with API standard RP-505...
Technical courses
Held technical courses on Eurocodes, CE conformity marking, Pressure Equipment Directive (PED), New Machine Directive, ATEX Directive…