- Piping Components
Ansys finite element analysis and  stress verification in accordance with ASME BPVC Section VIII Division 2 of a hanger flange.
Italy Steeltrade 2015
- Piping Components
Verification in accordance with appendix 2 of the ASME BPVC Section VIII Division 1 of a ring flange for expansion joint.
Italy Steeltrade 2015
- Piping Components
Construction design in accordance with EN 13480 of dozen of special piping components  with high design pressure and temperature, and operating in creep regime.
Italy Steeltrade 2013 - 2014
- Acque del Chiampo Water Purification Plant, Arzignano, Vicenza
Flexibility analysis of the gas and air lines of the water purification plant.
Arzignano,
Italy
Progett 2009 - 2010
- Turbogas Plant
Flexibility analysis of the DN 900 hot air outlet line from the heat recovery to the gas turbine.
Turin,
Italy
Tubiflex 2008
- Tisco BF H Plant
Flexibility analysis of six lines (comburent air, cold blast, depressurization, gas, mix cold blast, pressurization).
India Paul Wurth Italia 2006
- Endesa Italia spa Thermal Power Plant, Monfalcone
Revamping design of the main steam and resuperheated steam lines.
Monfalcone,
Italy
Gesco 2005
- ACSM Como Waste Treatment Plant
Design review of the steam lines.
Como,
Italy
Termomeccanica Ecologia 2001
- AGSM Verona, Borgo Trento Cogeneration Plant
Flexibility analysis and code verification of the main steam line.
Verona,
Italy
Ruths 2001
- Ambiente s.p.a. Thermal Power Plant not Conventional Combustibles, Scarlino
Flexibility analysis and code verification of the water circulation lines.
Scarlino,
Italy
Ruths 1999
- Gas Carrier
Lay-out arrangement of the reliquefaction and loading plant and the auxiliary plant lines for a 17.400 mc gas carrier (stratigraphies, isometrics, flexibility analyses, supports arrangement).
Italy Termomeccanica 1997 - 1998
- Revamping of the Air Liquide Plant, Limito, Pioltello
Plant arrangement and flexibility analysis of the steam and feedwater lines.
Pioltello,
Italy
Ansaldo Energia 1996 - 1998
- Elsta Terneuzen Dow Chemical Plant
Flexibility analyses, isometric and arrangement drawings, support drawings of the Recovery Heat Generator pipe lines. Supporting the approval process by the Dutch Authority Stoomwezen.
The Netherlands Ansaldo Energia 1996 - 1997
- Trieste Municipality Solid Waste Treatment Plant
Flexibility analysis, support arrangment and construction design for some piping lines.
Trieste,
Italy
TTR 1996 - 1998
- ST4 Project
Flexibility analysis of the surge vessel piping lines.
Italy Ansaldo Industria 1996
- Aghios Dimitrios Power Plant
Hot piping lines flexibility analysis.
Aghios Dimitrios,
Greece
Ansaldo Energia 1996
- Zaharani Thermal Power Plant
Flexibility analysis pipelines no. 10, 11, 12, 13 and 14.
Lebanon Ansaldo Energia 1996
- Brazil Polypropylene Plant
Pipe lines flexibility analysis.
Brazil Tecnimont 1996
- Yanbu Polypropylene Plant
Pipe lines flexibility analysis.
Saudi Arabia Tecnimont 1996
- Qafco III Ammonia-Urea Plant
Hot lines flexibility analysis.
Qatar Belleli 1996
- TG V64.3A
Flexibility analysis of water, gas, oil, blow-off, sealing air, extractor air lines.
Italy Ansaldo Energia 1996
- Avedore Power Station, Denmark
Construction design of the turbine and generator auxiliary piping and flexibility analysis of the plant lines.
Avedore,
Denmark
Ansaldo Energia 1996
- Brescia Waste-to-Energy Plant
Flexibility analysis of the plant piping lines.
Brescia,
Italy
Ansaldo Industria 1996
- Burgo Paper Factory Cogeneration Plant
Flexibility analysis of the boiler external lines.
Burgo,
Italy
Ruths 1996
- Rosignano Solvay Cogeneration Plant
Flexibility analysis, isometric and stratigraphy drawings, and support design of the heat recovery steam generator piping.
Rosignano,
Italy
Ansaldo Energia 1995 - 1996
- Cernavoda Nuclear Power Plant Unit 1, Romania
Flexibility analysis of conventional (BOP) piping lines.
Cernavoda,
Romania
Ansaldo Nucleare 1995 - 1996
- Jebel-Ali Power and Desalination Station
Flexibility analysis of the heat recovery steam generator piping lines.
Dubai Ansaldo Energia 1995
- Sondel Power Station, Turin
Flexibility analysis of the heat recovery steam generator piping lines.
Turin,
Italy
Ansaldo Energia 1994
- Le Vallette Power Station, Turin
Flexibility analysis natural circulation lines from CCV to boiler for the heat recovery and post-combustion steam generator 2 B93 HA01.
Turin,
Italy
Ruths 1991
- FIAT Mirafiori Power Station, Turin
Design of the boiler C2 superheated steam line.
Turin,
Italy
Ruths 1992
- Unified National Project
Management of the design activity related to the reactor primary coolant system.
Italy Ansaldo 1985 - 1986