Description | Site | Costumer | Year | |
---|---|---|---|---|
- | Chemical Industry Ansys finite elements dynamic analysis of a melter reactor, including the internal piping, subject to the mixer periodic loads. |
Italy | SAMEC | 2015 |
- | Mariner Topside Offshore Project Construction design in accordance with EN 13445 and PED, in addition to Statoil requirements, of an Active Carbon Filter made in Titanium grade 2. |
North See, UK | WPI | 2014 - 2015 |
- | Mariner Topside Offshore Project Construction design in accordance with EN 13445 and Statoil requirements of three Dosing Tanks made in Titanium grade 2. |
North See, UK | WPI | 2014 |
- | Sanitary Industry Design in accordance with ASME VIII-1 and PED of the pressure boundary parts of the ABS-H3 small steam sterilizer manufactured by die forming process. The design activity includes also finite element models of the rear head, the front cover and the outer door in order to assess the fatigue behaviour. |
Italy | Absolute-Up | 2014 - 2015 |
- | Boiler Evaporator State of stress calculation and verification at the the nozzle attachments to teh pressure equipment vaporizer. |
Russia | Ruths | 2014 |
- | Sanitary Industry Finite element analysis of the cast solution for the outer door of a small steam sterilizer and design in accordance with ASME VIII-1 and PED of the pressure boundary parts. |
Italy | Meteor / Absolute-Up | 2014 |
- | Technical Expertise Preparation of manufacturing quotations for pressure vessels made in Titanium or in Duplex stainless steel. |
Italy | WPI | 2014 |
- | Food Industry Construction design and certification in accordance with PED of a 1400 L tank in category IV, contining food fluid with gaseous nitrogen/carbon dioxide. |
Italy | Frambati | 2014 |
- | Food Industry Construction design and certification in accordance with PED of a 800 L tank in category IV, contining food fluid with gaseous nitrogen/carbon dioxide. |
Italy | Frambati | 2014 |
- | Food industry Construction design and certificatione in accordance with PED of a deaerator in category IV. |
Italy | Frambati | 2013 |
- | Food industry Construction design and certificatione in accordance with PED of a product tank in category III. |
Italy | Frambati | 2013 |
- | Sanitary industry Construction design in accordance with the ASME BPVC VIII-1 and PED of a small sterilizer. |
Italy | Absolute-Up | 2013 |
- | Mining industry Construction design in accordance with the ASME BPVC VIII-1 of a tank made in titanium. |
Finland | WPI | 2013 |
- | Petrochemical industry Construction design in accordance with ASME B31.8 of ten pig traps (four horizontal receivers and six vertical launchers) for a petrochemical platform on Caspian Sea (Filanovski Field). |
Russia | Bellelli Engineering | 2012 - 2013 |
- | Food industry Construction design and certificatione in accordance with PED of a 5.000 L product storage tank in category IV. |
Italy | Frambati | 2012 |
- | Fod industry Construction design and certificatione in accordance with PED of a 1.000 L product storage tank in category IV. |
Italy | Frambati | 2012 |
- | Food industry Construction design and certificatione in accordance with PED of a 200 L product storage tank in category IV |
Italy | Frambati | 2012 |
- | Food industry Construction design and certification in accordance with the ASME BPVC VIII-1 of a heat exchanger tube-in-tube. |
Italy | Frambati | 2012 |
- | Food industry Construction design and certification in accordance with PED of a 100 L aseptic storage tank in category III. |
Italy | Frambati | 2012 |
- | Technological plants Construction design and certification in accordance with PED of a stationary tank for Aquamix unit in category IV. |
Italy | Frambati | 2012 |
- | Technological plants Construction design and certification in accordance with PED of two, one high and one low pressure, gaseous air containment vessels in category IV. |
Italy | Frambati | 2012 |
- | Acque del Chiampo Water Purification Plant, Arzignano, Vicenza Verification of the pressure parts of the heat recovery gas-air heat exchanger. |
Arzignano, Italy |
Demont | 2012 |
- | Food industry Construction design and certification in accordance with PED of a 8.000 L product storage tank 8.000 in category IV. |
Italy | Frambati | 2012 |
- | Pharmaceutics industry Construction design and certification in accordance with PED of two 75 L aseptic tanks in category II. |
Italy | Frambati | 2011 |
- | Technological plants Construction design and certification in accordance with PED of a a mixing tank pressurized steam jacket in category II. |
Italy | Frambati | 2011 |
- | Food industry Construction design and certification in accordance with PED of two 700 L stationary tanks in category IV, serving the filling devices. |
Italy | Frambati | 2011 |
- | Food industry Construction design and certification in accordance with PED of a 50 L stationary tank in category I. |
Italy | Frambati | 2011 |
- | Food industry Construction design in accordance with PED of a 670 mm diameter colleting tank in category II. |
Italy | Frambati | 2011 |
- | Food industry Construction design and certification in accordance with PED of a 5000 L wheeled tank in category IV. |
Italy | Frambati | 2011 |
- | Food industry Construction design and certification in accordance with PED of a 100 L stationary tank in category II, serving the filling devices. |
Italy | Frambati | 2011 |
- | Trecate Sarpom Plant PED rerating of R-4501 Reactor (No. 1538). |
Trecate, Italy | Gesco | 2008 |
- | Prociner di Onyx-Soval Prociner Waste Treatment Center Design and structural verification of the gas duct and relevant steel supporting structures connected to the post-combustion unit. |
France | Sirtis | 2006 |
- | Val d’Agri Oil Center, Sulphur Recovery Plant Design, structural verification and elaboration of the execution drawings of the steel structure supporting the Hot Emergency Discharge V580-FK-801 and the relevant foundations. |
Val d’Agri, Italy | Cormin | 2000 - 2001 |
- | Ponti sul Mincio Thermal Power Plant Group 1 Boiler reburning and NOx reduction: survey of the existing structures and ducts, analysis of the new ducts lay-out, construction drawings of the new ducts and related supporting structures, design of the ducts and related reinforcing elements, design of the supporting structures. |
Ponti sul Mincio, Italy | Ansaldo Energia | 1997 - 1998 |
- | Rades and Liberty Plants, Tunisia Construction design and stress analysis of the API atmospheric tanks. |
Tunisia | Ansaldo Energia | 1996 – 1998 |
- | ILVA Taranto Heat Recovery Steam Generator Pressure part design for ISPESL certification. |
Taranto, Italy | Ansaldo Energia | 1995 - 1996 |
- | ACEA Rome Heat Recovery Steam Generator Pressure part design for ISPESL certification. |
Rome, Italy | Ansaldo Energia | 1995 - 1996 |
- | Bemberg Plant, Novara Boiler life extension calculations. |
Novara, Italy | Ansaldo Energia | 1995 - 1996 |
- | Termini Imerese Plant, Palermo Boiler life extension calculations. |
Palermo, Italy | Ansaldo Energia | 1995 - 1996 |
- | Italian Center for Aerospace Research (CIRA) Development of the refrigeration system of the aerospace ship mock-up in the plasma chamber of the simulation plant. |
Capua, Italy | Ansaldo Industria | 1996 |
- | Ammonia-Urea Qafco III Plant, Qatar Code verification and finite element analyses of some equipment. |
Qafco, Qatar | Belleli | 1996 |
- | Gela Plant Coke Drum supporting skirt fatigue verification. |
Gela, Italy | Belleli | 1996 |
- | Trieste Municipality Solid Waste Treatment Plant ISPESL certification of Flucorrex heat exchangers. |
Trieste, Italy | TTR | 1996 |
- | Busalla Oil Treatment Plant Structural design of the oil catalytic hydro-treatment plant. |
Busalla, Italy | Tecnimont | 1996 |
- | HALDIA Plant Sizing calculations for 14 columns. |
India | Tecnimont | 1996 |
- | Brazil Polypropylene Plant Equipment structural design. |
Brazil | Tecnimont | 1996 |
- | Porto Tolle Power Plant Design for revamping gas and air ducts system and boiler steel structures. |
Porto Tolle, Italy | ABB – CE | 1995 |
- | Mirfa Desalination Plant Desalinators structural design in accordance with ASME VIII-1 and supporting the qualification and aprroval process by the customer. |
Arab Emirates | Ansaldo Energia | 1994 - 1995 |
- | Kellog’s Plant Finite element analysis of the Gas-Gas Exchanger nozzles, tubesheets and heads. |
United States | Belleli | 1994 |
- | VEBA-OEL H2-N2-S2 Reactor Reactor construction design according to AD-Merkblatt and finite elements analysis of the critical parts. |
Germany | Belleli | 1993 |
- | Fluor Daniel Plant Reactor HTR construction design in accordance with the ASME BPVC. |
United States | Belleli | 1993 |
- | Petrokemya Olefins Plant Al-Jubail, Saudi Arabia Wind dynamic response of the Distillation Column BC 0955. |
Saudi Arabi | Belleli | 1992 |
- | SAFCO Ammoniaca/Urea Project, Saudi Arabia Assessment of the geometric longitudinal and circumferential irregularities of tower 1-C-302. |
Saudi Arabia | Belleli | 1992 |
- | MTBE Project, AL-Jubail, Saudi Arabia Dynamic analysis of methanol recovery column 230-T-207. |
Saudi Arabia | Belleli | 1992 |
- | Superphénix 1 Nuclear Power Plant Dalle thermo-mechanical analysis. |
France | Ansaldo Nucleare | 1992 |
- | SBWR Plant Evaluation, using the fracture mechanics approach, of the pressure vessel heat-up and cool-down pressure / temperature limit curves. |
Italy | Ansaldo Nucleare | 1992 |
- | Superphénix 1 Nuclear Power Plant Mechanical design of the tank MDC002BA and casings MDC001BA, MDC201BA, SGR301-302-306-307-308 BA. |
France | Ansaldo Nucleare | 1991 - 1992 |
- | Superphénix 1 Nuclear Power Plant Mechanical design of the hydraulic valves MDC 001 ZH and MDC 002 ZH. |
France | Ansaldo Nucleare | 1990 – 1991 |
- | Superphènix-1 Nuclear Power Plant Being manager of the Ansaldo nuclear component design area, development of the design of the new barillet. |
France | Novatome | 1986 - 1989 |
- | Trino Vercellese Enrico Fermi Nuclear Power Plant Pressurized Thermal Shocks (PTS) integrity analysis of the presure vessel. |
Italy | Enel | 1982 |
Exitus Acta Probat